What is Project Realisation?

Following the design development phase, our project team ensures the final end product is delivered through precise fabrication and coordinated site installation. 

With in-house capabilities and experienced teams, ADAS ensures quality control, accuracy, and seamless execution.

FABRICATION

ARCHITECTURAL STEEL | TENSILE MEMBRANE | ETFE SKYLIGHT

ADAS offers precision fabrication of complex architectural steel, tensile roof and facade systems, and custom components.

With in-house fabrication facilities and established quality control processes, we manufacture components in accordance with specified standards. Our fabrication scope includes structural steelworks, membrane cutting and welding, ETFE panel fabrication, connection assemblies, and modular components.

ADAS’s fabrication workflow ensures dimensional accuracy, material traceability, and consistency between design intent and physical output.

Our fabrication services include:

INSTALLATION

SITE MANAGEMENT | STRUCTURAL WORKS | MEMBRANE WORKS

ADAS manages the installation of lightweight structural systems with technical expertise and coordinated site execution.

Our installation scope covers site planning, logistics coordination, structural erection, membrane installation, and system integration.

With experienced installation teams with rope-access qualifications, we are fully equipped to handle complex geometries, long-span systems, and challenging site conditions.

Our range of installation services include:

TURNKEY PROJECT MANAGEMENT

PLANNING | DOCUMENTATION | COMPLIANCE

ADAS offers comprehensive, turnkey project management services that bridge the gap between initial project conception and final site delivery. Our end-to-end involvement includes the engagement of Qualified Persons (QPs) and coordination with multi-disciplinary consultants and specialists, such as for lighting works, lightning protection systems, fire protection systems, and more. 

We bridge the transition from design to reality by managing detailed simulations, installation sequencing, mockups and prototypes, ensuring a seamless transition from screen to fabrication yard. 
 
Fur turnkey projects, we take full ownership of the regulatory submissions as well, overseeing authority compliance and submissions to ensure final approvals are obtained. 
 
Throughout each project, we endeavour to maintain our clients’ interests as a top priority, to ensure projects are delivered whilst meeting design intent, quality standards, and timeline. 
 

Related Articles

Articles

ADAS® Installation of Tensile Membrane

As a result of design, fabrication and logistical planning, the installation of ADAS® Tensile Membrane structures is one of the final milestones in achieving good quality lightweight tensile structures. The

Read More >